\chapter{Application: Designing a Trajectory To Saturn} \label{results}
|
|
|
|
To consider a relatively simple but representative mission design objective, a sample mission to
|
|
Saturn was investigated.
|
|
|
|
\section{Mission Scenario}
|
|
|
|
The sample mission is defined to represent a general case for a near-future low-thrust
|
|
trajectory to Saturn. No constraints are placed on the flyby planets, but a number of
|
|
constraints were placed on the algorithm to represent a realistic mission scenario.
|
|
|
|
The first choice required by the application is one not necessarily designable to the
|
|
initial mission designer (though not necessarily fixed in the design either) and is that of
|
|
the spacecraft parameters. The application accepts as input a spacecraft object containing:
|
|
the dry mass of the spacecraft, the fuel mass at launch, the number of onboard thrusters,
|
|
and the specific impulse, maximum thrust and duty cycle of each thruster.
|
|
|
|
For this mission, the spacecraft was chosen to have a dry mass of only 200 kilograms for a
|
|
fuel mass of 3300 kilograms. This was chosen in order to have an overall mass roughly in the
|
|
same zone as that of the Cassini spacecraft, which launched with 5712 kilograms of total
|
|
mass, with the fuel accounting for 2978 of those kilograms\cite{cassini}. The dry mass of
|
|
the spacecraft was chosen to be extremely low in order to allow for a variety of
|
|
''successful`` missions in which the spacecraft didn't run out of fuel. That way, the
|
|
delivered dry mass to Saturn could be thought of as a metric of success, without discounting
|
|
mission that may have delivered just under whatever more realistic dry mass one might set,
|
|
in case those missions are in the vicinity of actually valid missions.
|
|
|
|
The thruster was chosen to have a specific impulse of 3200 seconds, a maximum thrust of
|
|
250 millinewtons, and a 100\% duty cycle. This puts the thruster roughly in line with
|
|
having an array of three NSTAR ion thrusters, which were used on the Dawn and Deep Space
|
|
1 missions\cite{polk2001performance}.
|
|
|
|
Also of relevance to the mission were the maximum $C_3$ at launch and $v_\infty$ at
|
|
arrival values. In order to not exclude the possibility of a non-capture flyby mission,
|
|
it was decided to not include the arrival $v_\infty$ term in the cost function and,
|
|
because of this, the maximum value was set to be extremely high at 500 kilometers per
|
|
second, in order to fully explore the space. In practice, though, the algorithm only
|
|
looks at flybys below 10 kilometers per second in magnitude. The maximum launch $C_3$
|
|
energy was set conservatively to 200 kilometers per second squared. This is upper limit
|
|
is only possible, for the given start mass, using a heavy launch system such as the
|
|
SLS\cite{stough2021nasa} or the comparable SpaceX Starship, though at values below about
|
|
half of this maximum, it begins to become possible to use existing launch solutions.
|
|
|
|
Finally, the mission is meant to represent a near future mission. Therefore the launch
|
|
window was set to allow for a launch in any day in 2023 or 2024 and a maximum total time
|
|
of flight of 20 years. This is longer than most typical Saturn missions, but allows for
|
|
some creative trajectories for higher efficiency.
|
|
|
|
It should be noted that each of these trajectories was found using an $n$ value of 20 as
|
|
mentioned previously, but in post-processing, the trajectory was refined to utilize a
|
|
slightly higher fidelity model that uses 60 sub-trajectories per orbit. This serves to
|
|
provide better plots for display, higher fidelity analyses, as well as to highlight the
|
|
efficacy of the lower fidelity method. Orbits can be found quickly in the lower fidelity
|
|
model and easily refined later by re-running the NLP solver at a higher $n$ value.
|
|
|
|
\subsection{Cost Function}
|
|
|
|
Each mission optimization also allows for the definition of a cost function. This
|
|
cost function accepts as inputs all parameters of the mission, the maximum $C_3$ at
|
|
launch and the maximum excess hyperbolic velocity at arrival.
|
|
|
|
The cost function used for this mission first generated normalized values for fuel
|
|
usage and launch energy. The fuel usage number is determined by dividing the fuel
|
|
used by the mass at launch and the $C_3$ number is determined by dividing the $C_3$
|
|
at launch by the maximum allowed. These two numbers are then weighted, with the fuel
|
|
usage value getting a weight of three and the launch energy value getting a weight
|
|
of one. The values are summed and returned as the cost value, represented as the value
|
|
$J$ below:
|
|
|
|
\begin{equation}
|
|
J(\vec{x}, m_{dry}, C_{3,max}) = 3 \left| \frac{h(\vec{x})}{m_{dry}} \right| +
|
|
\left| \frac{k(\vec{x})}{C_{3,max}} \right|
|
|
\end{equation}
|
|
|
|
\noindent
|
|
Where $h(\vec{x})$ represents the total fuel mass used during the trajectory and
|
|
$k(\vec{x})$ represents the launch $C_3$ of the initial phase.
|
|
|
|
\subsection{Flybys Analyzed}
|
|
|
|
Since the algorithm itself makes no decisions on the actual choice of flybys, that
|
|
leaves the mission designer to determine which flyby planets would make good
|
|
potential candidates. A mission designer can then re-run the algorithm for each of
|
|
these flyby plans and determine which optimized trajectories best fit the needs of
|
|
the mission.
|
|
|
|
For this particular mission scenario, the following flyby profiles were
|
|
investigated (E: Earth, M: Mars, V: Venus, J: Jupiter, S: Saturn). These flyby choices
|
|
were initially sampled randomly, but as patterns were noticed during the previous runs,
|
|
certain trajectories were chosen to investigate phases that seemed promising.
|
|
|
|
\begin{itemize}
|
|
\setlength\itemsep{-0.5em}
|
|
\item EJS
|
|
\item EMJS
|
|
\item EMMJS
|
|
\item EMS
|
|
\item ES
|
|
\item EVMJS
|
|
\item EVMS
|
|
\item EVVJS
|
|
\end{itemize}
|
|
|
|
\section{Faster, Less Efficient Trajectory}
|
|
|
|
In order to showcase the flexibility of the optimization algorithm (and the chosen cost
|
|
function), two different missions were chosen to highlight. One of these missions is a
|
|
slower, more efficient trajectory more typical of common low-thrust trajectories. The
|
|
other is a faster trajectory, quite close to a natural trajectory, but utilizing more
|
|
launch energy to arrive at the planet.
|
|
|
|
It is the faster trajectory that we'll analyze first. Most interesting about this
|
|
particular trajectory is that it's actually quite efficient despite its speed, in
|
|
contrast to the usual dichotomy of low-thrust travel. The cost function used for this
|
|
analysis did not include the time of flight as a component of the overall cost, and yet
|
|
this trajectory still managed to be the lowest cost trajectory of all trajectories found
|
|
by the algorithm, meaning that it has merit for both a flyby mission as well as a capture
|
|
mission.
|
|
|
|
The mission begins in late June of 2024 and proceeds first to an initial gravity assist with
|
|
Mars after three and one half years to rendezvous in mid-December 2027. Unfortunately, the
|
|
launch energy required to effectively use the gravity assist with Mars at this time is
|
|
quite high. The $C_3$ value was found to be $60.4102 \frac{\text{km}^2}{\text{s}^2}$. However,
|
|
for this phase, the thrust magnitudes are quite low, raising slowly only as the spacecraft
|
|
approaches Mars, allowing for a nearly-natural trajectory to Mars rendezvous. Note also that
|
|
the in-plane thrust angle was neither zero nor $\pi$, implying that these thrusts were
|
|
steering thrusts rather than momentum-increasing thrusts.
|
|
|
|
\begin{figure}[H]
|
|
\centering
|
|
\includegraphics[width=0.9\textwidth]{LaTeX/fig/EMS_plot}
|
|
\caption{Depictions of the faster Earth-Mars-Saturn trajectory found by the
|
|
algorithm to be most efficient; planetary ephemeris arcs are shown during the phase
|
|
in which the spacecraft approached them}
|
|
\label{ems}
|
|
\end{figure}
|
|
|
|
\begin{figure}[H]
|
|
\centering
|
|
\includegraphics[width=0.9\textwidth]{LaTeX/fig/EMS_plot_noplanets}
|
|
\caption{Another depiction of the EMS trajectory, without the planetary ephemeris
|
|
arcs}
|
|
\label{ems_nop}
|
|
\end{figure}
|
|
|
|
The second and final leg of this trip exits the Mars flyby and, initially burns quite
|
|
heavily along the velocity vector in order to increase its semi-major axis. After an initial
|
|
period of thrusting, though, the spacecraft effectively coasts with minor adjustments until
|
|
its rendezvous with Saturn just four and a half years later in June of 2032. The arrival
|
|
$v_\infty$ is not particularly small, at $5.816058 \frac{\text{km}}{\text{s}}$, but this is
|
|
to be expected as the arrival excess velocity was not considered as a part of the cost
|
|
function. If capture was not the final intention of the mission, this may be of little
|
|
concern. Otherwise, the low fuel usage of $446.92$ kilograms for a $3500$ kilogram launch
|
|
mass leaves much margin for a large impulsive thrust to enter into a capture orbit at
|
|
Saturn.
|
|
|
|
\begin{figure}[H]
|
|
\centering
|
|
\includegraphics[width=0.9\textwidth]{LaTeX/fig/EMS_thrust_mag}
|
|
\caption{The magnitude of the unit thrust vector over time for the EMS trajectory}
|
|
\label{ems_mag}
|
|
\end{figure}
|
|
|
|
\begin{figure}[H]
|
|
\centering
|
|
\includegraphics[width=0.9\textwidth]{LaTeX/fig/EMS_thrust_components}
|
|
\caption{The inertial x, y, and z components of the unit thrust vector over time for
|
|
the EMS trajectory}
|
|
\label{ems_components}
|
|
\end{figure}
|
|
|
|
In this case the algorithm effectively discovered that a higher-powered launch from
|
|
the Earth, then a natural coasting arc to Mars flyby would provide the spacecraft with
|
|
enough velocity that a short but efficient powered-arc to Saturn was possible with
|
|
effective thrusting. It also determined that the most effective way to achieve this
|
|
flyby was to increase orbital energy in the beginning of the arc, when increasing
|
|
the semi-major axis value is most efficient. All of these concepts are known to skilled
|
|
mission designers, but finding a trajectory that combined all of these concepts would
|
|
have required much time-consuming analysis of porkchop plots and combinations of
|
|
mission-design techniques. This approach is far more automatic than the traditional
|
|
approach.
|
|
|
|
The final quality to note with this trajectory is that it shows a tangible benefit of
|
|
the addition of the Lambert's solver in the monotonic basin hopping algorithm. Since the
|
|
initial arc is almost entirely natural, with very little thrust, it is extremely likely
|
|
that the trajectory was found in the Lambert's Solution half of the MBH algorithm
|
|
procedure.
|
|
|
|
\section{Slower, More Efficient Trajectory}
|
|
|
|
Next we'll analyze the nominally second-best trajectory. While the cost function provided to
|
|
the algorithm can be a useful tool for narrowing down the field of search results, it can
|
|
also be very useful to explore options that may or may not have quite as small of a cost
|
|
function value, but beneficial for other reasons. By outputting many different optimal
|
|
trajectories, the MBH algorithm can allow for this type of mission design flexibility.
|
|
|
|
To highlight the flexibility, a second trajectory has been selected, which has nearly
|
|
equal value by the cost function, coming in slightly lower. However, this trajectory
|
|
appears to offer some benefits to the mission designer who would like to capture into
|
|
the gravitational field of Saturn or minimize launch energy requirements, perhaps for a
|
|
smaller mission, at the expense of increased speed.
|
|
|
|
The first leg of this three-leg trajectory is quite similar to the first leg of the
|
|
previous trajectory. However, this time the launch energy is considerably lower, with a
|
|
$C_3$ value of only $40.4386$ kilometer per second squared. Rather than employ an almost
|
|
entirely natural coasting arc to Mars, however, this trajectory performs some thrusting
|
|
almost entirely in the velocity direction, increasing its orbital energy in order to
|
|
achieve the same Mars rendezvous. In this case, the launch was a bit earlier, occurring
|
|
in November of 2023, with the Mars flyby occurring in mid-April of 2026. This will prove
|
|
to be helpful in comparison with the other result, as this mission profile is much
|
|
longer.
|
|
|
|
\begin{figure}[H]
|
|
\centering
|
|
\includegraphics[width=0.9\textwidth]{LaTeX/fig/EMJS_plot}
|
|
\caption{Depictions of the slower Earth-Mars-Jupiter-Saturn trajectory found by the
|
|
algorithm to be the second most efficient; planetary ephemeris arcs are shown during
|
|
the phase in which the spacecraft approached them}
|
|
\label{emjs}
|
|
\end{figure}
|
|
|
|
\begin{figure}[H]
|
|
\centering
|
|
\includegraphics[width=0.9\textwidth]{LaTeX/fig/EMJS_plot_noplanets}
|
|
\caption{Another depiction of the EMJS trajectory, without the planetary ephemeris
|
|
arcs}
|
|
\label{emjs_nop}
|
|
\end{figure}
|
|
|
|
The second phase of this trajectory also functions quite similarly to the second phase
|
|
of the previous trajectory. In this case, there is a little bit more thrusting necessary
|
|
simply for steering to the Jupiter flyby than was necessary for Saturn rendezvous in the
|
|
previous trajectory. However, most of this thrusting is for orbit raising in the
|
|
beginning of the phase, very similarly to the previous result. In this trajectory, the
|
|
Jupiter flyby occurs late July of 2029.
|
|
|
|
\begin{figure}[H]
|
|
\centering
|
|
\includegraphics[width=0.9\textwidth]{LaTeX/fig/EMJS_thrust_mag}
|
|
\caption{The magnitude of the unit thrust vector over time for the EMJS trajectory}
|
|
\label{emjs_mag}
|
|
\end{figure}
|
|
|
|
\begin{figure}[H]
|
|
\centering
|
|
\includegraphics[width=0.9\textwidth]{LaTeX/fig/EMJS_thrust_components}
|
|
\caption{The inertial x, y, and z components of the unit thrust vector over time for
|
|
the EMJS trajectory}
|
|
\label{emjs_components}
|
|
\end{figure}
|
|
|
|
Finally, this mission also has a third phase. The Jupiter flyby provides quite a strong
|
|
$\Delta V$ for the spacecraft, allowing the following phase to largely be a coasting arc
|
|
to Saturn almost one revolution later. During the most efficient part of the journey,
|
|
some thrust in the velocity direction accounts for a little bit of orbit-raising, but
|
|
the phase is largely natural. Because of this long coasting period, the mission length
|
|
increases considerably during this leg, arriving at Saturn in December of 2037, over 8
|
|
years after the Jupiter flyby.
|
|
|
|
However, there are many advantages to this approach relative to the other trajectory.
|
|
While the fuel use is also slightly higher at $530.668$ kilograms, plenty of payload
|
|
mass is still capable of delivery into the vicinity of Saturn. Also, it should be noted
|
|
that the incoming excess hyperbolic velocity at arrival to Saturn is significantly
|
|
lower, at only $3.4774\frac{\text{km}}{\text{s}}$, meaning that less of the delivered
|
|
payload mass would need to be taken up by impulsive thrusters and fuel for Saturn orbit
|
|
capture, should the mission designer desire this.
|
|
|
|
\section{Final Trajectory Analysis}
|
|
|
|
Ultimately, two optimized trajectories were selected to be excellent candidates for further
|
|
consideration. The resultant flyby selection, launch and arrival dates, and relevant cost
|
|
function input of those trajectories can be found in Table~\ref{results_table} below:
|
|
|
|
\begin{table}[h!]
|
|
\begin{small}
|
|
\centering
|
|
\begin{tabular}{ | c c c c c c | }
|
|
\hline
|
|
\bfseries Flyby Selection &
|
|
\bfseries Launch Date &
|
|
\bfseries Mission Length &
|
|
\bfseries Launch $C_3$ &
|
|
\bfseries Arrival $V_\infty$ &
|
|
\bfseries Fuel Usage \\
|
|
& & (years) & $\left( \frac{km}{s} \right)^2$ & ($\frac{km}{s}$) & (kg) \\
|
|
\hline
|
|
EMS & 2024-06-27 & 7.9844 & 60.41025 & 5.816058 & 446.9227 \\
|
|
EMJS & 2023-11-08 & 14.1072 & 40.43862 & 3.477395 & 530.6683 \\
|
|
\hline
|
|
\end{tabular}
|
|
\end{small}
|
|
\caption{Comparison of the two most optimal trajectories}
|
|
\label{results_table}
|
|
\end{table}
|
|
|
|
As mentioned before, the launch energy requirements of the second trajectory are quite a bit
|
|
lower. Having a second mission trajectory capable of launching on a smaller vehicle could be
|
|
valuable to a mission designer presenting possibilities. According to an analysis of the
|
|
Delta IV and Atlas V launch configurations\cite{c3capabilities} in Figure~\ref{c3}, this
|
|
reduction of $C_3$ from around 60 to around 40 brings the sample mission to just within
|
|
range of both the Delta IV Heavy and the Atlas V in its largest configuration, neither of
|
|
which are possible for the other result, meaning that either different launch vehicles must
|
|
be found or mission specifications must change.
|
|
|
|
\begin{figure}[H]
|
|
\centering
|
|
\includegraphics[width=\textwidth]{LaTeX/fig/c3}
|
|
\caption{Plot of Delta IV and Atlas V launch vehicle capabilities as they relate to
|
|
payload mass \cite{c3capabilities} from Vardaxis, et al, 2007 }
|
|
\label{c3}
|
|
\end{figure}
|